Commercial Gas Fuelled Engines (CGFE1).
SGAS was the first centre in the UK to offer the ACS assessment for Commercial Gas Fuelled Engines (CGFE1).
This module has been specially designed to meet the requirements of the CHP (combined heat & power) industry.
Training is normally delivery at the SGAS centre and the practical assessments are conducted on site at specific locations.
The CGFE1 Assessment, Training Course includes:-
-
Installation and site requirements
-
Controls & Component Operation
-
Commissioning of the ‘Gas Train’
-
Checking & Setting Valve Clearances
-
Checking & Setting Spark Plug Clearances
-
Combustion Analysis
-
Waste Heat Recovery Heat Exchangers
-
Exhaust Discharge Requirements
-
Plant Room Ventilation (Comustion & Cooling)
| ACS Code | Description | Training Duration (if required - training is not a pre-requisite to assessment) | Assessment Duration (based on model time values) |
|---|---|---|---|
| COCN1 | Core Commercial Gas Safety – NG | 2 Days | 2 Days |
| CODNCO1 | Change over from Domestic NG to Commercial | 2 Days | 1 - 1.5 Days |
| CGFE1 | NG and LPG Fuelled Engines – NG and LPG | 0.5 Day | 0.5 Day |
| ICPN1 | Installation of Commercial Pipework (first fix) NG/LPG | 0.5 Day | 0.5 Day |
| BMP1 | Commission, Service, Repair & Breakdown of Boosters, Compressors, Controls and Pipework NG (≤ 0.5bar) | 0.5 Day | 0.5 Day |
| CIGA1 | Commission, Service, Repair & Breakdown of Commercial Indirect Fired Heating Equipment NG/LPG | 0.5 Day | 0.5 Day |
| CMET1 | Install & Commission Commercial Low Pressure Diaphragm(U65 and above) and RPD meters | 0.5 Day | 0.5 Day |
| CMET2 | Install & Commission Commercial Turbine Meters | 2 Days | 0.5 Day |
| ICPN1 | Installation of Commercial Pipework (first fix) NG/LPG | 0.5 Day | 0.5 Day |
| TPCP1a | Testing and Purging of Low Pressure Commercial Pipework not exceeding 1m3 in vol & 40mb operating pressure. NG | 1 Day | 0.5 Day |
| TPCP1 | Testing and Purging of Commercial Pipework - this assessment covers NG & LPG installations | 1 Day | 0.5 Day |






